Set on a dramatic clifftop site, The Imperial Hotel Building at Clifton has undergone a complete refurbishment and fitout of the heritage-listed site that has been closed for the past 20 years. An iconic new hospitality venue will serve as a catalyst for the rejuvenation of the area.
Products Used
Apollo Limestone Honed
The refurbishment works included three floors, two kitchens, two bars, a lift, a dumb waiter and a three-level terrace deck extension. Sareen Stone supplied 130m2 of the Apollo Limestone honed installed to transform the interiors.
Related Articles
We will work with you, your architect or designer to bring your ideas to life.